Aspects of the 1 Hotel Central Park project included full demo, new electrical power, lighting/controls, and fire alarm, new HVAC units and controls, new plumbing and fixtures, wood and carpet floors, full-height windows and doors along most of the exterior, Portola paint, new parapet railings, opened slab & extension of existing stairs on 1 floor, an extended elevator and machine room shaft on 1 floor, new parapet paver, wood, and tile, stucco and EFIS, gutters and roofing, an extended existing line chute, metal panel sound barriers at the mechanical catwalk, and a new room on the existing terrace.







