PS 338 Building

The 107,000-square-foot primary/intermediate PS/IS 338 school was built to accommodate 742 students on five floors with 37 classrooms and a partial cellar. EW Howell Construction Group served as the General Contractor on this project.

Designed by Purcell Architects, this new PS/IS incorporates a full program for Pre-K through eighth grade. The square footage requirements of the program for the PS 338 school called for the entire site to be developed.

The school structure is situated along Coney Island Avenue with the main entrances to the school from Hinckley and Turner Avenues. The building structure comprises two major blocks; the academic block and the public assembly block. The academic block is a five-story structure with the PS functions occupying the lower two levels. The public assembly block encompasses the cafeteria/kitchen at the cellar level, the gymatorium function occupies the first and second-floor levels, and the gymnasium occupies the third-floor level. The side streets allow for a drop off area for school buses along with a wider sidewalk to ease the congestion at the beginning and end of the school day.

Location

Brooklyn, NY

Scope

New Construction

Size

107,000 Sq. Ft.

Client

New York City School Construction Authority (SCA)

Architect

Purcell Architects

Project Gallery

Related Projects

Let’s Build Together

For general inquires or a new, New York-based construction project, click the button below or email [email protected].

245 Newtown Rd. Suite 600
Plainview, NY 11803
516.921.7100
37 West 37th St. 7th & 8th Floor
New York, NY 10018
212.930.1050

© 2026 EW Howell - All Rights Reserved

ISO 9001:2015 Certified
EW Howell Ethics Reporting System – The EW Howell Ethics Reporting System offers all EW Howell employees anonymity to report unethical conduct that violates laws and internal EW Howell rules and regulations. Please refer to the EW Howell employee handbook or RT Center for more information.
Ethics Reporting Hotline – 866.384.4278